Within the framework of the project, the following works were performed and handed over:
- Underwater Soil Replacement
- Ground Improvement
- Revetment Works
- Construction of Wave Wall
- Laying of 1525x20mm casing pipes under the existing
cofferdam in two places - Dredging of the seabed to the dimensions and levels
specified in the project - Extension of 1525x20mm casing pipes to the sea in two
double lines - Installation of 36 piles made of D426x11mm pipe on the seabed
in the dimensions given in the project - Installation of I-Beam profiles on the underwater piles
- Lowering and installation of RC-3 and RC-4 concrete sections
- Underwater connection of RC-3 and RC-4 concrete sections
with casing pipes - Lowering and installation of RC-1, RC-2 and RC-5 concrete
sections; - Jet grout pumping under the concrete;
- Filling of stones in accordance with the project and
construction of a cofferdam on the pipes; - Welding of HDPE 1200mm, PN16 pipes and into casing pipes