Kurik Port
ADO-G Has been heavily involved in the construction of Kuryk Seaport located in the Kazakhstan Republic. Our main direction was the construction of piers and quayside infrastructure. Jack-up barges were used for piling works on the quayside and for dredging operations in the port harbor.
Fish Restaurant Next To The Lighthouse
A fish pond built in the open sea is intended for keeping special types of fish. During construction, special equipment and methods were used. The company’s special floating equipment (Jack-Up Barge) and impact pumps were used in driving piles and piles, concreting, dredging and supplying bottom materials, and transporting materials at sea. The diameter of …
Cofferdam Rehabilitation & Water Intake Structure Project
Within the framework of the project, the following works were performed and handed over: Underwater Soil Replacement Ground Improvement Revetment Works Construction of Wave Wall Laying of 1525x20mm casing pipes under the existingcofferdam in two places Dredging of the seabed to the dimensions and levelsspecified in the project Extension of 1525x20mm casing pipes to the …
Read more “Cofferdam Rehabilitation & Water Intake Structure Project”
Fountain “Lotus”
As a part of boulevard redevelopment program, ADO-G constructed a 160 m water fountain at Baku bay. The structure was prefabricated from steel and transported to the installation site. The fountain itself is inspired by a lotus flower and has specialized light show that works afternoon hours. The project scope included installation of 600mm intake …
Construction of the Military Port
The total length of a pier is 485 m, width-10, the bridge part is established at height of 3 meters from a sealevel. The platform is intended for the mooring of heavily-loaded vessels. The main part in length of 135 meters carries out a role of breakwaters. Piling work in construction of a pier is …