Gabion Construction in Baku Boulevard
“North Road” Project
Each type of visual aid has pros and cons that must be evaluated to ensure it will be beneficial to the overall presentation. Before incorporating visual aids into speeches, the speaker should understand that if used incorrectly, the visual will not be an aid, but a distraction. Planning ahead is important when using visual aids. …
Mud Plant
The project scope consisted of constructing a foundation slab for the mud plant tanks. The project was initiated and finalized in 2005 and the client was BP contractor KBR. This specific project was ADO-G’s first industrial construction project and it allowed the firm to further develop its various wings and diversify.
Kurik Port
ADO-G Has been heavily involved in the construction of Kuryk Seaport located in the Kazakhstan Republic. Our main direction was the construction of piers and quayside infrastructure. Jack-up barges were used for piling works on the quayside and for dredging operations in the port harbor.
Fish Restaurant Next To The Lighthouse
A fish pond built in the open sea is intended for keeping special types of fish. During construction, special equipment and methods were used. The company’s special floating equipment (Jack-Up Barge) and impact pumps were used in driving piles and piles, concreting, dredging and supplying bottom materials, and transporting materials at sea. The diameter of …
Cofferdam Rehabilitation & Water Intake Structure Project
Within the framework of the project, the following works were performed and handed over: Underwater Soil Replacement Ground Improvement Revetment Works Construction of Wave Wall Laying of 1525x20mm casing pipes under the existingcofferdam in two places Dredging of the seabed to the dimensions and levelsspecified in the project Extension of 1525x20mm casing pipes to the …
Read more “Cofferdam Rehabilitation & Water Intake Structure Project”
Fountain “Lotus”
As a part of boulevard redevelopment program, ADO-G constructed a 160 m water fountain at Baku bay. The structure was prefabricated from steel and transported to the installation site. The fountain itself is inspired by a lotus flower and has specialized light show that works afternoon hours. The project scope included installation of 600mm intake …
Baku Ferris Wheel
Project description – construction of the foundation slab (size 54h38h1.5m) over bored piles D = 1500 mm, H = 30 m. During this project 132 units of bored piles was drilled (sizes of piles – D = 1500 mm, a depth of 30 m.)
Construction of the Military Port
The total length of a pier is 485 m, width-10, the bridge part is established at height of 3 meters from a sealevel. The platform is intended for the mooring of heavily-loaded vessels. The main part in length of 135 meters carries out a role of breakwaters. Piling work in construction of a pier is …