Module Office

The office building located in Baku was constructed using prefabricated steel structures and is planned as a modular structure that in theory can be broken apart and transported to a different location. The exterior is covered in metallic facade panels and the building is colored black to help with low temperatures in winter and throughout …

Cubic Tower

According to studies and surveys conducted by the specialists of ADO –G Group of Companies with customers, it was revealed that Batumi city of Georgia has a great potential in tourism sector. The most appropriate area was carefully selected in order to implement the project. According to the technical and economic feasibility and marketing studies …

Olympic Sports complex in Tovuz

Tovuz Olympic Complex built on 5 hectares, in 100 m from the Tovuz river. Tovuz Olympic Complex, designed in a modern architectural style, consists of three buildings, which consist of two-storey hall, 2 storey pool table and lounge area of the building and of the 5-storey hotel building, collected all the conditions for the development …

Embassy of Azerbaijan in Uzbekistan

The project scope was to plan and construct the honorary embassy of the Azerbaijan Republicin Turkmenistan. The construction works began in 2003 and finalized in 2004. The project was planned and constructed by ADO-G group from start to hand-over and all construction materials were imported from Azerbaijan. During the opening ceremony of the embassy, President …