UPPER KARABAKH CANAL WATER RECEIVER

PRODUCTION OF HYDROMECHANICAL EQUIPMENT FOR THE UPPER KARABAKH CANAL WATER RECEIVER

The Upper Karabakh Canal is of great importance in the development of agriculture in the economic sphere of our country. Due to the complex design of hydraulic equipment on this canal, they were produced in foreign countries and brought to our country. ADO-G Construction, Supply and Installation LLC successfully completed the project, organizing high-quality production of hydraulic equipment at its production base.
As part of the project, the following hydraulic equipment was manufactured and transferred:

  1. Working lock (001-YQK-01-HAV-01-YC-1) – 47 tons
  2. Repair gateway (001-YQK-01-HAV-02-YC-01) – 30 tons
  3. Garbage net (001-YQK-01-HAV-03-YC-1) – 34 tons
  4. Pontoon 7000 x 11696 mm (001-AZE-045-TQƏL-0 –004) – 20 tons
    The production process and acceptance of the final product were carried out by Japanese specialists who have extensive experience in this field throughout the world.